
Dig Depth, Reach and Dump Height: The Three Numbers That Decide the Job
Maximum dig depth is the headline figure, but reach and dump height decide whether you can load a trailer or dig a footing from where the ma...
What the numbers on a spec sheet actually mean for the work you do, and how the Rippa range compares.

Maximum dig depth is the headline figure, but reach and dump height decide whether you can load a trailer or dig a footing from where the ma...

What "1.8 tonne" or "3.2 tonne" really means, why operating weight matters more than anything else on the spec sheet, and where each Rippa c...

Rated load, tipping load and lift capacity are three different numbers. Knowing the difference stops you buying a loader that can't lift the...

Zero tail swing keeps the counterweight inside the track width so you can slew against a wall. It also changes stability, lifting and price....
Every enquiry, quote and sale is handled by Rippa Perth in Bellevue on the main site.